Documenti full-text disponibili:
|
Documento PDF (Thesis)
Disponibile con Licenza: Salvo eventuali più ampie autorizzazioni dell'autore, la tesi può essere liberamente consultata e può essere effettuato il salvataggio e la stampa di una copia per fini strettamente personali di studio, di ricerca e di insegnamento, con espresso divieto di qualunque utilizzo direttamente o indirettamente commerciale. Ogni altro diritto sul materiale è riservato
Download (5MB)
|
Abstract
The increasing amount of waste, which may cause severe economic and environmental consequences, needs to be properly managed by communities and governments. Therefore, it is necessary to have master plans aimed at decreasing waste generation and mitigating its impacts. This thesis deals with construction and demolition waste (CDW) and focuses in particular on circular methods for a proper management of CWD. To deepen the analysis, building information modelling (BIM) is introduced, with a particular focus on a BIM-integrated method employed for measuring the circularity level in buildings. In this method the circularity is measured in a numeric way through the REVIT software and a case study is presented therein for a better understanding.
Abstract
The increasing amount of waste, which may cause severe economic and environmental consequences, needs to be properly managed by communities and governments. Therefore, it is necessary to have master plans aimed at decreasing waste generation and mitigating its impacts. This thesis deals with construction and demolition waste (CDW) and focuses in particular on circular methods for a proper management of CWD. To deepen the analysis, building information modelling (BIM) is introduced, with a particular focus on a BIM-integrated method employed for measuring the circularity level in buildings. In this method the circularity is measured in a numeric way through the REVIT software and a case study is presented therein for a better understanding.
Tipologia del documento
Tesi di laurea
(Laurea magistrale)
Autore della tesi
Ashrafi Habibabadi, Shahab
Relatore della tesi
Correlatore della tesi
Scuola
Corso di studio
Indirizzo
Earth resources engineering
Ordinamento Cds
DM270
Parole chiave
Building information technology,BIM,construction and demolition waste,waste management,circularity in constructions,circularity assessment
Data di discussione della Tesi
19 Luglio 2023
URI
Altri metadati
Tipologia del documento
Tesi di laurea
(NON SPECIFICATO)
Autore della tesi
Ashrafi Habibabadi, Shahab
Relatore della tesi
Correlatore della tesi
Scuola
Corso di studio
Indirizzo
Earth resources engineering
Ordinamento Cds
DM270
Parole chiave
Building information technology,BIM,construction and demolition waste,waste management,circularity in constructions,circularity assessment
Data di discussione della Tesi
19 Luglio 2023
URI
Statistica sui download
Gestione del documento: