Feasibility study and flow scheduling optimization of a multi-product pipeline system

Papp, Katalin (2016) Feasibility study and flow scheduling optimization of a multi-product pipeline system. [Laurea magistrale], Università di Bologna, Corso di Studio in Ingegneria chimica e di processo [LM-DM270], Documento ad accesso riservato.
Documenti full-text disponibili:
[img] Documento PDF
Full-text accessibile solo agli utenti istituzionali dell'Ateneo
Disponibile con Licenza: Salvo eventuali più ampie autorizzazioni dell'autore, la tesi può essere liberamente consultata e può essere effettuato il salvataggio e la stampa di una copia per fini strettamente personali di studio, di ricerca e di insegnamento, con espresso divieto di qualunque utilizzo direttamente o indirettamente commerciale. Ogni altro diritto sul materiale è riservato

Download (3MB) | Contatta l'autore

Abstract

The first goal of this study is to analyse a real-world multiproduct onshore pipeline system in order to verify its hydraulic configuration and operational feasibility by constructing a simulation model step by step from its elementary building blocks that permits to copy the operation of the real system as precisely as possible. The second goal is to develop this simulation model into a user-friendly tool that one could use to find an “optimal” or “best” product batch schedule for a one year time period. Such a batch schedule could change dynamically as perturbations occur during operation that influence the behaviour of the entire system. The result of the simulation, the ‘best’ batch schedule is the one that minimizes the operational costs in the system. The costs involved in the simulation are inventory costs, interface costs, pumping costs, and penalty costs assigned to any unforeseen situations. The key factor to determine the performance of the simulation model is the way time is represented. In our model an event based discrete time representation is selected as most appropriate for our purposes. This means that the time horizon is divided into intervals of unequal lengths based on events that change the state of the system. These events are the arrival/departure of the tanker ships, the openings and closures of loading/unloading valves of storage tanks at both terminals, and the arrivals/departures of trains/trucks at the Delivery Terminal. In the feasibility study we analyse the system’s operational performance with different Head Terminal storage capacity configurations. For these alternative configurations we evaluated the effect of different tanker ship delay magnitudes on the number of critical events and product interfaces generated, on the duration of pipeline stoppages, the satisfaction of the product demand and on the operative costs. Based on the results and the bottlenecks identified, we propose modifications in the original setup.

Abstract
Tipologia del documento
Tesi di laurea (Laurea magistrale)
Autore della tesi
Papp, Katalin
Relatore della tesi
Correlatore della tesi
Scuola
Corso di studio
Indirizzo
Sustainable technologies and biotechnologies for energy and materials
Ordinamento Cds
DM270
Parole chiave
Flow scheduling,Optimization,Event based discrete time representation,Multi-product pipeline,Feasibility study
Data di discussione della Tesi
7 Ottobre 2016
URI

Altri metadati

Statistica sui download

Gestione del documento: Visualizza il documento

^