Ionas, Adrian Ciprian
(2023)
Offshore Pipeline Systems Pre-commissioning.
[Laurea magistrale], Università di Bologna, Corso di Studio in
Offshore engineering [LM-DM270] - Ravenna, Documento full-text non disponibile
Il full-text non è disponibile per scelta dell'autore.
(
Contatta l'autore)
Abstract
The scope of this paper is to describe the theory and execution of pre-commissioning activities for submarine pipeline systems starting from the recommended practice from standards and going through real applications.
Pre-commissioning is the phase in between construction and start-up of the pipeline systems. The scope of pre-commissioning phase is to clean the pipeline, check its integrity and prepare it for the transport of hydrocarbons.
The operations herein described are not intended to be applicable to all pipeline systems but the majority. Special consideration must be made on a case-by-case basis.
At the end of this paper is presented an overview of “Dry Pre-commissioning” or “System pressure test replacement” which intends to be the future in the pre-commissioning of subsea pipeline systems.
Abstract
The scope of this paper is to describe the theory and execution of pre-commissioning activities for submarine pipeline systems starting from the recommended practice from standards and going through real applications.
Pre-commissioning is the phase in between construction and start-up of the pipeline systems. The scope of pre-commissioning phase is to clean the pipeline, check its integrity and prepare it for the transport of hydrocarbons.
The operations herein described are not intended to be applicable to all pipeline systems but the majority. Special consideration must be made on a case-by-case basis.
At the end of this paper is presented an overview of “Dry Pre-commissioning” or “System pressure test replacement” which intends to be the future in the pre-commissioning of subsea pipeline systems.
Tipologia del documento
Tesi di laurea
(Laurea magistrale)
Autore della tesi
Ionas, Adrian Ciprian
Relatore della tesi
Scuola
Corso di studio
Indirizzo
OFFSHORE ENERGY TECHNOLOGIES
Ordinamento Cds
DM270
Parole chiave
Pre-commissioning, Offshore Pipeline, Dry Pre-commissioning, Flooding, Cleaning, Gauging, Hydrotest, Dewatering, Drying, Inerting
Data di discussione della Tesi
18 Luglio 2023
URI
Altri metadati
Tipologia del documento
Tesi di laurea
(NON SPECIFICATO)
Autore della tesi
Ionas, Adrian Ciprian
Relatore della tesi
Scuola
Corso di studio
Indirizzo
OFFSHORE ENERGY TECHNOLOGIES
Ordinamento Cds
DM270
Parole chiave
Pre-commissioning, Offshore Pipeline, Dry Pre-commissioning, Flooding, Cleaning, Gauging, Hydrotest, Dewatering, Drying, Inerting
Data di discussione della Tesi
18 Luglio 2023
URI
Gestione del documento: